About Us
M/s J. Kumar & Co. is formed in the year 1980 and it is registered independently as Class I-A Contractor with P.W.D., Government of Maharashtra, registered as Class ‘A’ contractor with Mumbai Municipal Corporation, registered as Group ‘A’ Class I with Vidharbha Irrigation Development Corporation Nagpur. M/s J. Kumar & Co. is converted into M/s J. Kumar & Co. (India) Pvt. Ltd., a company registered under Companies Act 1956 and registered in Class 1-A with Public Works Department, Government of Maharashtra w.e.f. 02.12.1999. As per Memorandum of Association of M/s J. Kumar & Co. (India) Pvt. Ltd., the main object of the company is to take over the existing business of Proprietorship Concern M/s J. Kumar & Co. along with all its liabilities and assets including deposits. M/s J. Kumar & Co.(India) Pvt. Ltd. has taken over the proprietary concern J. Kumar & Company. The name of M/s. J. Kumar & Co. (I) Pvt. Ltd. has been changed in to M/s. J. Kumar Infraprojects Pvt. Ltd., w. e. f. 08.01.07. The same company has been converted into a Public Limited Company i.e. J. Kumar Infraprojects Ltd., w. e. f. 31.01.07 and registered with Registrar of Companies, Maharashtra, Mumbai and also registered in Class 1-A with Public Works Department, Government of Maharashtra w.e.f 30.08.2007. The registrations of Municipal Corporation of Greater Mumbai and is also obtained in the name of J. Kumar Infraprojects Ltd.
M/s J. Kumar Infraprojects Ltd. has got experience of various road works in busy city area, both in concrete pavement and flexible pavements. We have successfully completed work of swimming pool of international standard along with allied sports complex involving complicated long span structural buildings with latest modern specification at Goregaon Sport Club. We are having experience of earthen dam with gorge filling, Tail channel, Spillways, Canal work, Aqueducts in Irrigation Department. We are having experience of Multi-storied Building Construction, Mass Housing etc. We have successfully completed the New Terminus Building at Bandra for Western Railway. We have also executed Commercial Building “Goldline Business Center” at Malad Mumbai. Now we have concentrated on bridge work, flyover and sub-ways.
..2..
We have successfully completed work of 3 Sub-ways by Box Pushing Method without hindrance to highway traffic. We have completed work of Aurangabad flyover with Pre-cast Pre-stressed / Post-tensioned girders launched and side shifted at site and then casting of Diaphragm walls, Deck Slabs to make it a continuous span structure. We had completed 1410.50 mtrs long flyover in Bhiwandi City for Bhiwandi Nizampur City Municipal Corporation and completed one R.O.B. work with approaches at LC 114/A at Nandgaon on Malegaon Aurangabad Road (SH-16). We have executed two projects in CSI Airport for AAI namely Construction of New Bridge across Mithi River carrying B-3 Taxi Track and Construction of Rapid Taxi Track at 1700m and 2200m from displaced threshold of main runway 27 at CSI Airport. Also we have executed the work of construction of flyover at Hadapsar, Pune. 558 mtrs long, 17.20 mtrs wide and the Construction of ROB at Udaybaug Pune for MSRDC. The work of Construction of major flyover at Dindoshi, Goregaon, and flyover at Thakur Complex, Flyover at Times of India Jn., Malad on W.E.H. have been completed and opened for traffic along with the completion of the work of Widening and Construction of Western Express Highway and Service Roads from Goregaon to Dahisar. We had executed the construction of Grade Separator Bridge along Mumbai Pune Road at Chinchwad and Construction of raising Hanger and approach road work at Juhu Helibase for ONGC. Mumbai and also the work of ROB and underpass by using Precast Box pushing technology below W.E.H. at Bandra for laying 5th & 6th lines of Western Railway and Construction of Bridge No.20 across Mithi River for MRVC. We had also constructed one bridge across Mithi River in Bandra Kurla Complex for MMRDA. Recently we had completed the work of construction of ROB work between Dahisar and Mira Road station across Western Railway and opened for traffic.
At present in Mumbai the flyover works at Barfiwala Junction, Design & Construction of R.O.B. and Flyover at Milan Subway including vehicular underpass and development of roads at Santacruz, Mumbai are in progress for MMRDA under MUIP. Eleven works of Nalla Widening and reconstruction in Joint Venture with other agencies and also one ROB work at Jogeshwari (South) in J.V. with another agency are in progress for MCGM. We have also completed three C.C. Road Works for Municipal Corporation of Greater Mumbai. All these Nalla works are at various stages of completion.
..3..
Design & Construction of one Bridge cum Flyover over on Mulla River near Holkar Bridge at Pune is for PMC is in progress. Recently, our company secured orders for Design & Construction of flyover at Amar Mahal, Chembur for connecting SCLR to Eastern Express Highway, Construction of flyover from Panjrapole to Ghatkopar Mankhurd Link Road (Part of Eastern Freeway) of 2.5km length with PSC Segmental type construction, Construction & Widening of Vasai ROB with approaches from MMRDA, Design & Construction of flyover at Kapurbawadi with PSC Segmental type construction at Thane from MSRDC, Construction of Road BRTS from Nashikphata to Kaspate Vasti at Pune for PCMC. Under Irrigation Department, we have executed Earthwork and Structure of Ashta Distributory Canal, Ramthirth Distributory Canal and Box culvert and structures including Earthwork from Km 69 to 71 of Bembla Main Canal, Dahegaon (Gargoti) M I Tank and Construction of Gated Barrage at Pulgaon across River Wardha are in progress for Irrigation Department.
M/s J. Kumar Infraprojects Ltd along with M/s Nagarjuna Construction Co formed a Joint Venture “NCC-J.Kumar J.V.” on 50:50 partnership bagged orders for Construction of flyover on Dr Ambedkar Road, Mumbai from MMRDA amounting to Rs. 138.96 crores. The revised cost of work is Rs 180.00 crores. The entire work (100%) is executed by J. Kumar Infraprojects Ltd as per our construction agreement. The flyover is segmental type construction. The work is completed and opened for traffic on 05.05.2011
We have Secured orders for Construction of 19 Skywalks in Mumbai costing Rs.567.00 crores from MMRDA and MSRDC. Out of this, seven skywalks are completed and opened for public, 4 Nos of Skywalks have been dropped by Client and work on remaining skywalks are at various stages of completion. We have secured order for one major Skywalk (Partly cable stayed) at Kharghar from CIDCO and the work is also nearing completion.
We have now entered in the work of Metro Railway project. Recently we have secured orders for one metro project for CIDCO at Navi Mumbai and another Metro project at New Delhi CC-02 for Delhi Metro Railway Corporation and both the works are in progress.
..4..
We have also secured orders for construction of Monorail and Station costing about Rs 90.00 crores from Larsen & Toubro Ltd at Wadala as Sub contractor and work is in progress and awarded one package of Metro costing Rs 145.00 crores. Work Order for Design and construction of flyover at Mahape with approaches under MMRDA is also received and the work is in progress. In addition to the above we have secured orders for Construction of ESIC Hospital and Medical College at Alwar, Rajasthan from UPRNN Ltd, Lucknow and EPC Contract for Widening and Improvement to Sion Panvel Special State Highway (Under BOT) from BARC Junction to Uran Flyover Retaining wall end point excluding the 1.8 km, T.C.B. portion, preliminary work and mobilization on all these projects are completed and the work is in progress.
The total cost of Ongoing Projects of M/s J. Kumar Infraprojects Ltd. is Rs 2866.32 crores and the cost of balance work to be completed will be Rs 2172.48 crores. We have got adequate brand new machineries such as Excavator, Loader, Dozer, Graders, Hydraulic Piling Rigs, Static Rollers, Trucks / Tippers, Tankers, Trailers of heavy duty, Automatic Concrete Batching Plants, Transit Mixers, Concrete Pumps, Boom placers, Vibratory Rollers, Tandem Rollers, Hot Mix Plants, Crushers, Sensor Pavers, Pre-stressing Jacks, Cranes of various capacity, Gantries Launching Trusses, Auto Launching Tower crances, etc and various types of centering material to take up various Infrastructural Projects of any special specification with Open / Pile Foundations as well as Building works.
The Company has executed a number of Buildings and Flyover works and other Infrastructure Projects with Pile Foundation since its inception. From 2007 the Company has created one separate piling division under the over all control of one of the Directors. We have acquired twenty-one brand new Hydraulic Piling Rigs. We undertake piling work anywhere in India on completed item rates or on labour charges as required by the client. We are having a dedicated and experienced team of Piling Engineers and Technicians to undertake piling work of any magnitude. We are in a position to mobilize additional equipments and machineries as and when required by the clients for timely completion of the projects.
..5..
M/s J Kumar Infraprojects Limited is having now more than 175 Engineers in its Roll. All these Engineers are well qualified with Post Graduation, Engineering Degree Diploma holders with experience of 2 to 30 years in Infrastructural projects
M/s J Kumar Infraprojects Limited is ISO 9001-2008, ISO 14001-2004 and OHSAS 18001-2007 certified company. All the projects are executed as per the above ISO Manuals as per the client’s requirements.
The Main strength of the company is our dedicated and well experienced Engineers, Technicians and other staff members and the availability of a large fleet of most modern plants, equipments and machineries under the guidance of expert management.
Intrested Candidate can apply on official website of the company: Apply now
CONTACT INFO
You can always contact with us via email or phone.
Regd Office:
J. Kumar House, CTS No. 448, 448/1, 449, Vile Parle (East), Subhash Road, Mumbai 400057, Maharashtra, India
Tel: +91 22-68717900
Email: [email protected]
Nodal Officer- Mrs. Poornima Reddy
Deputy Nodal Officer- Ms. Krinjal C. Shah
For investor grievances email us at
REGISTRAR AND SHARE TRANSFER AGENT OF THE COMPANY [W.E.F. 21/08/2021]
Bigshare Services Private Limited Corporate Office: Office No S6-2, 6th Floor, Pinnacle Business Park, Next to Ahura Centre, Mahakali Caves Road, Andheri (East) Mumbai – 400093
Tel: 022–62638200
Fax: 02262638299
Email: [email protected]
Website: www.bigshareonline.com